Real feedback loops
Your work is measured in prime yield and off-gauge metres, not in a leaderboard. The feedback is brutal and immediate.
We are a small team building physical AI for one of the hardest control problems in heavy industry. If you want your model to change what a mill produces at three in the morning, this is the place.
pass 6/7autonomy: assisted-writetwin delta 0.004 mmaudit id 7f31c
Our engineers are in these plants most weeks
The honest pitch, including the parts that will not suit everyone.
Your work is measured in prime yield and off-gauge metres, not in a leaderboard. The feedback is brutal and immediate.
Vision at line speed, physics-informed models, GPU inference at the edge, and a system that moves multi-tonne equipment.
You will learn metallurgy. Everyone here does. The engineers who ignore it build models that a rolling engineer dismisses in one meeting.
Small team, few processes, real consequences. Nothing ships to a mill without someone's name on it.
Engineering is in the plant during shadow and assist. If you never want to wear steel-toed boots, this is not the role.
Heavy industry moves slowly and then permanently. We optimise for being right in three years, not for a launch next month.
All roles are hybrid with regular plant travel. Locations reflect proximity to design-partner sites.
You have run a mill and can tell a model why it is wrong. You will own what correct means for gauge, shape and TMCP, and hold veto on anything reaching a line.
Line-speed defect classification on eight to thirty-two cameras per line, at sub-15 ms. TensorRT, DeepStream, and a lot of hard-won data work.
Model-predictive control for gauge and shape, integrated with Level-2 systems that were never designed for a second opinion. Rust or C++ at the edge.
Roll-bite mechanics, thermal evolution, flatness and microstructure in Omniverse, calibrated against real coil history until it predicts to microns.
In the plant every week through shadow and assist. Part engineer, part diplomat, entirely responsible for whether a deployment succeeds.
Own the control-path guards, segmentation and the architecture pack that OT teams review. IEC 62443 experience strongly preferred.
Four steps, roughly two to three weeks, no take-home longer than four hours.
45 minutes with the hiring manager about what you have built and what you want to build next.
Two hours on your actual domain, with someone who does the job. No puzzles, no whiteboard trivia.
A scoped, paid exercise using realistic mill data — or a walkthrough of your own prior work if you prefer.
Meet the team, and where practical, visit a design-partner line so you know what you are signing up for.
Straightforward, with the caveat that we are early.
Every employee holds equity with a standard, documented framework. No opaque terms.
Business-class on long-haul, proper per diems, and time off after intense commissioning weeks.
Metallurgy courses, IEC 62443 training, conferences — pre-approved up to an annual allowance.
Workstation-class machines and lab GPU access. Nobody trains models on a laptop here.
Mills run continuously; people should not. Core overlap hours, otherwise your schedule is yours.
[PLACEHOLDER] Policy documented and shared during the process; we do not publish a number we might have to revise.
Four practices that survive contact with a plant.
Small teams with clear ownership. Every deployment has one engineer whose name is on it, and that person can stop a promotion regardless of what commercial pressure exists.
Written first. Decisions with consequences get written down, reviewed and archived — the same discipline we apply to envelopes and objective functions in the product.
Metallurgists have veto. If a rolling engineer says a recommendation is wrong for a reason we cannot model yet, it does not ship. Deferring to domain expertise is not politeness; it is how you avoid destroying a customer's coil.
We say what we do not know. Internally and externally, uncertainty gets marked rather than smoothed over. It is the only way to be trusted with a hot mill.
[UNKNOWN] Exact headcount is shared during the hiring process rather than published.
“We ran Steelira in shadow for eight weeks on the tandem mill. It called eleven of the twelve off-gauge tail events before our AGC reacted. That was the moment the argument ended.”
“Our best roller retires in two years. Steelira is the first system that captured how he sets up a hard automotive grade — and then explained why, with the coil history to back it.”
“Prime yield moved 1.7 points on the galvanizing line and reheat gas fell double digits. Nothing else we bought this decade did both.”
No cover letter. Tell us about one thing you built, what broke, and what you did about it.
Send us what you are good at anyway. We hire ahead of roles more often than we advertise them.